Outside
- New foundation, to allow for "The 100 year flood" elevating the Lodge
about 3 feet will be required. This will be the single largest most expensive
project and must be done before all others.
- Replace and expand addition that will hold bathrooms, heating system, Well
Tank and filter system, etc.
- Remove stucco walls and restore original wood under it.
- Replace roof with aluminum
- Front Porch
- Walkway, handicap access
- Gravel parking lot
- Handicap Elevator
- Fire escape
- Replace and Relocate A/C. Needs to be placed high off ground on wall
- Relocate heating oil tank. replace with underground type
- Landscape outside, plants, bushes, etc.
- Replace Well Pump
- Well casing cover / marker, of decorative type to keep it from being hit
by cars
- Lights for the Flag Pole
- Outdoor floodlights
- Add outside hose faucets
- Add outside Electrical outlets
- MORE LATER
Inside Downstairs
- Countertops, all stainless steal of commercial type
- New Restrooms, both Men's & Women's of handicap type
- Replace and move Heating and A/C system to backroom addition. Will need to
include replacement of air ducts.
- Replace Water Heater
- Replace Well Tank
- Replace water filter system
- Replace all electrical wiring
- Replace front door
- Restore floors, sand them down and refinish
- Restore walls, sand them down and refinish
- Restore ceiling, sand them down and refinish
- Book Selves
- Ceiling fans
- MORE LATER
Inside Upstairs.
- Restore floors, sand them down and refinish
- Restore walls, sand them down and refinish
- Restore ceiling, sand them down and refinish
- Attic fan
- Ceiling fans
- Fireproof Safe
- MORE LATER
Inside both Downstairs and Upstairs.
- Replace all electrical wiring and lights
- Insolate all walls and attic.
- Emergency lighting
- Fire sprinkler system
- Replace or Restore all windows
- MORE LATER
|